Ok, after all of my testing I've setup our production BES 5.0 Server, using the trial SRP from RIM and CALS from our existing running BES 4.1.6 server.

The 5.0 has no internet access as of yet. But what I'm wondering is when I do flip that switch is it going to cause issues with the CALS running on 2 different servers. Basically I just want to have both running, and use the transporter tool to migrate everyone over to the 5.0 server, then shut down the old one.

Or is it going to be ok since I'm running it with a different SRP (I will switch to the corrent one once everyone is migrated)